Configuration Management Board Ccb Glossary

The span of Configuration management begins for the Government once the first configuration doc is permitted and baselined. This usually happens when the useful configuration baseline (referred to as the requirements baseline in EIA/IS-649) is established for a system or configuration merchandise. It exhibits the configuration control process divided into three segments, which are detailed in Figures 6-2, 6-3 and 6-4, respectively.

  • Via the configuration control course of, the full impression of proposed engineering changes and deviations is identified and accounted for of their implementation.
  • The contractual configuration control authority addresses the whole set of paperwork that are baselined for the product managed by that authority for a specific contract.
  • The CDCA on the other hand, pertains to specs or any other kind of document and is independent of the group that bodily maintains and stores the document.
  • The outcomes of architecture evaluations ought to be used to information decisions for approving proposed adjustments, as well as in planning future extensions or updates to the Architectural Description.
  • If the configuration management authority for one contract is the CDCA for the system/CI Efficiency specification for the product, then the other configuration control authorities are considered application activities as a result of their authority extends solely to the use of the product and its documentation.

DM2 issues impacting the inspiration are forwarded to the International Protection Enterprise Structure Specification (IDEAS) Group for consideration. When a selection of adjustments have accrued, the TWG recommends a new DM2 baseline version be established and launched. Upon, approval by the CCB, the new DM2 is printed together with a report of adjustments from last baseline and a brand new working copy is setup. To impact change to a product, the first step artificial general intelligence is the revision of the documents defining the product. The ideas mentioned below facilitate carrying out this step, utilizing automated tools similar to a CM AIS. This handbook views these ideas from each program management (macro) point of view and the document management (micro) point of view.

Product Baseline

As described in 6.1, configuration management of baselined configuration documentation is an integrated change management course of together with both performing activity (generally a contractor) and tasking activity (generally the government) responsibilities for change preparation, justification, analysis, coordination, disposition, and implementation. Via the configuration control course of, the complete impression of proposed engineering changes and deviations is recognized and accounted for in their implementation. Configuration change management for organizational methods entails the systematic proposal, justification, implementation, testing, review, and disposition of system changes, including system upgrades and modifications. Configuration change management contains adjustments to baseline configurations, configuration objects of systems, operational procedures, configuration settings for system elements, remediate vulnerabilities, and unscheduled or unauthorized modifications. Processes for managing configuration modifications to methods embrace Configuration Control Boards or Change Advisory Boards that evaluation and approve proposed modifications.

The contractual configuration control authority addresses the total set of paperwork which are baselined for the product managed by that authority for a particular contract. Beneath, for particular person documents that require change (e.g., a system or CI performance specification). If it’s not the CDCA for a given doc, it does not have the authority to approve a proposed change to that document, and therefore should solicit ECP approval from the applicable CDCA, or choose an alternate design. The CCB may, once in a while, set up technical working groups (TWG), as required, to oversee, evaluation, and make recommendations to the board on particular technical aspects of the CM Program, or configuration items https://www.globalcloudteam.com/. TWGs present the subject-matter experience essential to ensure that documents, the DM2, and different merchandise under configuration management of the CCB are maintained in a responsible method.

configuration control board

Useful Baseline

It makes provisions for progressive implementation and tailoring of particular configuration administration processes to be used by system suppliers, developers, integrators, maintainers and sustainers. The PM approves the Configuration Management Plan and may ensure adequate resources are allocated for implementing Configuration Management throughout the life cycle. • Configurations – One of the key configuration administration aims is to attenuate the variety of completely different CI configurations that must be concurrently supported, significantly if the different CI configurations require completely different or updated operational software program, support equipment, help software, spares, training or publications.

The classification standards should be applied to the entire CI applications via coordination between the affected actions. The program workplace and developer share responsibility for planning, implementing and overseeing the Configuration Administration process and its supporting actions. The distribution of responsibilities between the program workplace and the developer varies, based mostly on the acquisition strategy and the life-cycle phase. DM2 change requests (action items) can be raised by any of the working group members or move configuration control board down from the CCB. A working copy of the DM2 is maintained, along with all reference and research materials and the present action merchandise tracker.

Figure 6-4 fashions the third section of Determine 6-1, overlaying the portion of the method concerned with Government review and disposition of contractor submitted ECPs and RFDs. It illustrates native Authorities consultant evaluate and concurrence with class II changes and minor deviations (where such action is contractually required) and its endorsement (or non-endorsement) of sophistication I modifications and major/critical deviations. The CCB then reviews the proposal and the implementation commitments and both approves or disapproves them in accordance with the procuring activity’s policy. As a result of the CCB choice, implementing path is given, sometimes within the form of a CCB directive. Actions directed by the CCB include each contractual actions and tasking orders for Authorities activities, as applicable. In response to a CCB Directive, the Authorities contracting office prepares and negotiates a contract modification to authorize the contractor to proceed with implementation of the accredited class I ECP or major/critical deviation.

CCB membership should consist of, however not be restricted to representatives from logistics, training, engineering, production administration, contracting, configuration administration and different program related practical disciplines. CM offers an orderly way to facilitate change, based on a documented necessities baseline, and using best practices within the change administration process. This is intended to ensure that expectations are absolutely understood and realized in an efficient manner, including proper consideration of all potential impacts on clients and sources. CM is a needed and critical process to guarantee an orderly and steady evolution of any Architectural Description and in addition to make certain that the DoDAF stays present in the face of evolving methods and methods of Architectural Description creation and administration. In addition, the DoD-adopted normal EIA-649-1, Configuration Administration Necessities for Defense Contracts, implements the rules outlined in ANSI/EIA-649B for use by protection organizations and industry partners throughout all phases of the acquisition life cycle.

A CCB secretariat schedules meetings, distributes agendas, data CCB selections, and distributes minutes and directives to parties who are assigned implementing action(s) or have a need to know. The CCB working procedures must also define target processing occasions for ECPs to assure well timed staffing, approval and implementation. Appropriate evaluation standards should be developed in the CM Plan and utilized according to the scope and tier of the Architectural Description effort.

There could additionally be a quantity of configuration management authorities for a product with more than one consumer; each being a configuration control authority for a given contract. If the configuration control authority for one contract is the CDCA for the system/CI Performance specification for the product, then the other configuration control authorities are thought of application actions because their authority extends solely to the use of the product and its documentation. They can’t authorize change to either, however they might take part within the change management course of if asked for input by both the configuration control authority that’s the CDCA, or by the Authorities lead software activity. The membership of the CCB is generally comprised of the important thing practical or material experts from the Authorities organization, e.g. Built-in Program Staff (IPT). Other practical personnel may be included, as may be dictated by the change and/or program necessities including representatives from other DoD companies (for joint service programs) and different international locations (for multi-national programs).

In addition, the process makes affected parties aware that a change is being developed and permits them to provide pertinent enter. (Contractors also make use of a similar course of for their inner configuration control.) CCBs are often comprised of the joint command or company physique chartered to behave on class I ECPs and requests for major or crucial deviations. The program manager is often the chairperson of the CCB and makes the selections concerning all adjustments brought before the CCB. The CCB is a program management process utilized by this system supervisor to ascertain all the benefits and the impacts of the change earlier than the decision is made. When a call is rendered, the CCB chairperson approves a CCB directive, or equal letter/memorandum, directing the appropriate implementing actions to be completed. The contractual configuration control authority approving the implementation of a change to a product (system/CI) might initially reside with a contractor or with the Authorities.

configuration control board

Since all current CI configurations can’t typically be updated simultaneously, careful consideration should be given to both delaying or accelerating the incorporation of the change to minimize the impact. Combining or packaging a variety of software program adjustments into the next version could additionally be one other, and so forth. CCB charters are normally permitted through the government procuring activity official administrative channels. All CCB members should be current at each CCB meeting and must be familiar, from their functional perspective, with the modifications being thought of. CCB members are obligated to make their position(s) recognized to the chairperson; and in the end to approving the CCB directive/order (when required) noting their settlement or disagreement with the decision.

Its flexibility lies in the ability to provide CM practices that might be selectively applied to the diploma needed for each of the areas to be coated under this plan. Check, validate, and doc modifications to the system earlier than finalizing the implementation of the modifications. These CM activities are complementary with present DoD CM processes for the DARS, the DoD Data Technology Requirements Registry (DISR), and the Metadata Registry (MDR).

The analysis criteria should embrace components that take a look at compliance with the Net-Centric Reference Architectures and the DoD IE as outlined in Part 3.zero of the DoDAF and the Net-Centric Steering contained in Volume 2. The outcomes of architecture evaluations should be used to guide selections for approving proposed adjustments, in addition to in planning future extensions or updates to the Architectural Description. All functions of the affected CI have to be thought-about when classifying a change, e.g., ECPs initiated against a CI being manufactured by multiple contractor, a CI which has a number of applications or is used by multiple tasking (application) actions.

To approve the CCB Directive (CCBD), an individual should be the first (or alternate) CCB member designated by the CCB charter. The CDCA on the other hand, pertains to specifications or any different type of document and is impartial of the organization that physically maintains and stores the document. The CDCA is the group that has the choice authority over the contents of the document, reflecting proprietary or data rights to the information that the document contains. The procuring activity’s CM workplace ought to publish procedures for CCB operation so that each one members perceive its importance to the acquisition course of.